Rule C: Storm-Water Management Plans

1. Policy.

It is the policy of the Board of Managers to:

2. Regulation.

A permit and stormwater management plan is required under this rule for new development, redevelopment, or additions to an existing site.

3. Design Criteria For Stormwater Management Plans.

Stormwater management plans must comply with the following criteria:

4. Required Exhibits.

The following exhibits must accompany the permit application. One set, full size; two sets, reduced to maximum size of 11”x17”.

5. Platting Or Easement Documents.

Applicant must provide platting or easement documents showing sufficient drainage and ponding/flowage easements over hydrologic features such as floodplains, storm sewers, ponds, ditches, swales, wetlands and waterways. Structures and facilities subject to flood damage built within the 100-year flood will have two feet of freeboard between the lowest floor and the 100-year flood profile.

6. Exceptions.